📖
Yemen, Republic of - Yemen Improved Water Management and Irrigation for Sustainability and Efficiency Project
World Bank

Yemen, Republic of - Yemen Improved Water Management and Irrigation for Sustainability and Efficiency Project

Author / Organization:
Economics & Development Published 2026 Verification Pending

Overview & Synopsis

Yemen Improved Water Management and Irrigation for Sustainability and Efficiency Project for Yemen has the development objectives of strengthening the climate and water information management system and enhancing climate-resilient irrigation services and access to water supply and sanitation services in selected basins. Component 1: Climate and Water Information Management Systems will support climate-resilient decision-making by developing and operationalizing a scalable national Climate and Water Information Management System (CWIMS), including data inventory and digitization, monitoring network assessment and design, interoperable platforms, and establishment of a System Management Unit, with basin-level tools and coordination. Sub-component 1.1: Developing a Climate and Water Information Management System (CWIMS) will reactivate and upgrade the former national system, integrate hydro-meteorological and groundwater data, and ensure secure, accessible analytics. Sub-component 1.2: Developing Climate-Resilient Decision-Making and Monitoring Networks in Prioritized Basins will create basin decision support tools, strengthen stakeholder coordination, update Integrated Water Resources Management (IWRM) and investment plans for Aden-Tuban and Wadi Hajir, and build local capacity. Component 2: Improved Integrated Watershed Management and Irrigation will deliver climate adaptation investments to enhance water and food security through water harvesting and storage, flood protection, irrigation modernization, and soil conservation, alongside farmer and institutional capacity building. Sub-component 2.1: Integrated Management of Water and Agriculture in the Aden-Tuban Basin will rehabilitate check and diversion dams, ponds, cisterns, and canals; reinforce wadi banks with nature-based solutions; restore terraces and on-farm infrastructure including drip, sprinkler, and solar-powered systems; use cash-for-work and community contracting; and rehabilitate the historic Aden Water Cisterns for flood protection and rainwater harvesting. Sub-component 2.2: Integrated Management of Water and Agriculture in the Wadi Hajir Basin will upgrade canals, recharge and storage structures, flood protection works, and promote water-saving and solar-powered irrigation technologies with erosion control and terrace restoration. Sub-component 2.3: Institutional Support and Capacity Building will strengthen Water User Associations (WUAs), Water Basin Committees (WBCs), and local offices, and prepare studies for the next program phase. Component 3: Resilient Water Supply and Sanitation Systems and Water, Sanitation, and Hygiene (WASH) Services in selected areas will restore, expand, and climate-proof Water Supply and Sanitation (WSS) systems with priority for non-revenue water reduction, solar power, and decentralized desalination pilots. Sub-component 3.1: Restoring Access to and Improving Quality of WSS Services will rehabilitate and expand pipelines, wells, pumping and booster stations, water and wastewater treatment plants, rainwater harvesting, and small-scale desalination, and improve community water points. Sub-component 3.2: Improving WASH Services for Internally Displaced Persons, refugee, and marginalized communities will rehabilitate facilities in camps, health centers, and schools, provide water quality improvements, water trucking where necessary, and support disease prevention. Sub-component 3.3: Capacity-Building for Water Utilities and Community Organizations will train Local Water and Sanitation Corporations (LWSCs), General Authority for Rural Water Supply Projects (GARWSP) branches, and community groups in operation and maintenance, metering and billing, financial management, non-revenue water reduction, and wellfield sustainability, and will advance preparatory studies for desalination in Aden. Component 4: Project Support, Management, Evaluation and Administration will finance management, monitoring and evaluation, independent audits, third-party monitoring, and technical assistance. Implemented by the United Nations Development Program (UNDP) and the United Nations Office for Project Services (UNOPS), Phase 1 applies an area-based approach in the Aden-Tuban and Wadi Hajir basins and emphasizes inclusive participation, community ownership, and institutional strengthening.

Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Yemen, Republic of - Yemen Improved Water Management and Irrigation for Sustainability and Efficiency Project
Author / Organization World Bank
Subject & Discipline Sanitation,Water Resources,Public Administration - Water, Sanitation, and Solid Waste Management ,Public Administration - Agriculture, Fishing, and Forestry ,Irrigation and Drainage,Social Protection
Categories Economics & Development
Publication Year 2026
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-131032
Original Source Link Visit Source Page on documents.worldbank.org »