Eastern and Southern Africa - Regional Power Trade and Market Project
World Bank

Eastern and Southern Africa - Regional Power Trade and Market Project

Author / Organization:
Economics & Development Published 2026 Verification Pending

Overview & Synopsis

RETRADE-Eastern Africa MPA Phase 1 for Eastern Africa has the development objectives to increase electricity connectivity and trade in the Eastern Africa Power Pool and, for the Uganda–Tanzania interconnection, to increase electricity connectivity and trade between Uganda and Tanzania. Components of the Uganda: Uganda–Tanzania Interconnector Project (UTIP) include: Component 1, Construction of the Wobulenzi–Masaka–Mutukula 400 kilovolt double circuit transmission line and associated substations at Wobulenzi (extension) and Masaka (new), creating a high-capacity cross-border corridor with about 1,000 megawatt transfer capability to strengthen reliability, evacuate surplus hydropower, and enable regional exchanges; Component 2, Environment and Social risk mitigation, financing implementation of environmental and social instruments including the Environmental and Social Management Plan, biodiversity offsets, the Resettlement Action Plan and the Livelihood Restoration and Assistance Plan, alongside measures to manage labor influx and sexual exploitation and abuse/sexual harassment risks; Component 3, Project implementation and institutional support, covering detailed design, Owner’s Engineer and Project Implementation Unit support, operational expenses, targeted capacity building on climate mitigation and adaptation and on the Gender Action Plan, acquisition of selected training equipment for energy sector training facilities, and oversight and coordination by the Ministry of Energy and Mineral Development, including intergovernmental and inter-utility engagements, environmental and social oversight, land acquisition and grievance redress mechanisms. Components of the Regional Power Trade and Market Project include: Component 1, EAPP Regional Market and Trade Strengthening, providing post–go-live support for the regional day-ahead market, development of a regional transmission pricing methodology, market performance review in the first year of live trading, and operational strengthening of the independent Market Operator (MO); Component 2, Regional Grid Operations Support, updating the EAPP Interconnection Code, developing operating guidelines including third-party access, climate resilience and cybersecurity standards, supporting efficient control area operations and coordinated operational planning, and delivering system operator training and certification; Component 3, Planning and Priority Infrastructure Development, with Sub-components 3.1 Regional Planning Support to develop and pilot a regional power system data platform and strengthen planning data governance, Sub-component 3.2 Priority Regional Project Development to prepare upstream analytical and preparatory studies for priority regional interconnectors and national reinforcements that relieve cross-border flow constraints with climate resilience integrated in designs, and Sub-component 3.3 Support for Upstream Development of Transmission Public–Private Partnership projects to scope, pre-feasibility, and structure national or cross-border independent transmission projects using project finance principles; Component 4, Institutional Strengthening of the EAPP General Secretariat and Regional Coordination, with Sub-component 4.1 to finance the Project Implementation Unit and strengthen transparency through annual reports with audited financial statements, website updates, a resource mobilization strategy and a multi-year budgeting framework with a balanced scorecard, Sub-component 4.2 to convene regional dialogue and stakeholder outreach including an EAPP–SAPP coordination forum, and Sub-component 4.3 Women’s leadership advancement through an EAPP Women’s Leadership Advancement Program and related mentorship for women professionals; Component 5, Regional Regulatory Strengthening for the Independent Regulatory Body (IRB), with Sub-component 5.1 to embed regulatory expertise and develop rules and procedures, Sub-component 5.2 to establish market surveillance, investigations, transparency guidelines and third-party access frameworks and to review market instruments, Sub-component 5.3 to harmonize national regulatory frameworks supporting private sector participation in transmission and competitive market participation, and Sub-component 5.4 to establish a regional regulatory capacity development program with a host institution and implement specialized courses.

Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Eastern and Southern Africa - Regional Power Trade and Market Project
Author / Organization World Bank
Subject & Discipline Railways,Energy Generation - Wind,Public Administration - Energy,Energy Networks and Storage,Trade,Social Inclusion,Social Inclusion,Energy Generation - Solar,Public Administration - Energy,Energy Networks and Storage,Energy Generation - Hydro,Central Government (Central Agencies)
Categories Economics & Development
Publication Year 2026
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-150309
Original Source Link Visit Source Page on documents.worldbank.org »