Poland - Odra-Vistula Flood Management Project
Overview & Synopsis
Ratings of the Odra-Vistula Flood Management Project for Poland were as follows: outcome was moderately satisfactory; Bank performance was moderately satisfactory; monitoring and evaluation quality was substantial. Lessons and recommendations emphasize that integrated flood risk management combining structural, non-structural, and nature-based solutions across basins underpins effective resilience and should be continued and expanded. Procurement strategies should balance smaller packages that foster domestic participation with appropriately sized lots that attract firms with the technical and financial capacity required for complex works, informed by early market analysis and engagement to optimize competition, delivery, and cost-effectiveness. Future operations should improve investment readiness by grounding selection in comprehensive watershed-level studies and pairing feasibility analyses with detailed designs and environmental and social assessments to enable timely execution. Project design and implementation should include contingency planning and flexible financing to adapt to shocks, enabling rapid reallocations and contract adjustments for emergency recovery while maintaining relevance and effectiveness. Institutional coordination and capacity building remain critical; stable, well-resourced project coordination and implementation units with early training on procedures, safeguards, and contract management should be sustained through institutional transitions, with mechanisms to ensure continuity and ownership. Grievance response systems should combine centralized oversight with localized engagement to enable early issue detection, transparent processes, and timely resolution, thereby strengthening stakeholder trust and establishing durable prevention and management practices.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Poland - Odra-Vistula Flood Management Project |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | FY17 - Other Public Administration,FY17 - Other Transportation,FY17 - Public Administration - Water, Sanitation and Waste Management,FY17 - Other Water Supply, Sanitation and Waste Management |
| Categories | Economics & Development |
| Publication Year | 2026 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-180183 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |