📖
Bosnia and Herzegovina - Federation Road Asset Management Enhancement Project
World Bank

Bosnia and Herzegovina - Federation Road Asset Management Enhancement Project

Author / Organization:
Economics & Development Published 2026 Verification Pending

Overview & Synopsis

Federation Road Asset Management Enhancement Project for Bosnia and Herzegovina has development objectives to improve transport connectivity and enhance road network management. Component 1: Improved Transport Connectivity will finance climate-resilient rehabilitation and reconstruction of priority main roads, bypasses, bridges, and tunnels based on Road Asset Management System (RAMS) priorities, road safety inspection and audit, and climate risk vulnerability assessments, with designs climate-proofed to withstand extreme rainfall and flood events of 1 percent annual probability and incorporating drainage, slope stabilization, resilient pavement materials, and safety features. Sub-components include: Sub-component 1.1: Investments in a program of climate-resilient rehabilitation and reconstruction of priority national roads, delivering physical works on about 150 km of the network, including up to several bypasses, along existing alignments with pavement resurfacing, drainage improvements, strengthening, and safety upgrades, supported by site supervision, technical control, and relevant audits; Sub-component 1.2: Road safety and resilience improvements, comprising remediation of the road safety blackspot at the Mostar North Junction; establishment of a centralized Road Safety Database aligned with the Common Accident Data Set (CADaS) protocol; update of the Guidelines for Design, Construction, Maintenance, and Supervision (GDCMS) to integrate road safety, active mobility, and climate resilience; and a pilot Safe School Zones program implementing safety features around 20 schools across all cantons. Component 2: Enhanced Road Network Management will support sector governance, financial sustainability, and efficient operation of the network. Sub-components include: Sub-component 2.1: Enhance operational management and financial sustainability, including development of a Service Level Agreement framework between the government and the road company and recommendations for a revised road funding formula, upgrading RAMS to include structures, climate resilience, road safety performance, and economic evaluation modules, and deploying systems for effective assets and traffic management such as a centralized Intelligent Transportation Systems control center, Weigh-in-Motion systems, and hazard detection equipment; Sub-component 2.2: Project management support and capacity building through training, knowledge exchange, short-term consultancy, and operating costs, and an internship program of 30 three-month placements with at least 60 percent allocated to women, developed in collaboration with education institutions. Component 3: Contingent Emergency Response Component will enable rapid access to financing for immediate rehabilitation and construction needs in case of an eligible crisis or emergency, guided by a dedicated manual and an Emergency Action Plan.

Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Bosnia and Herzegovina - Federation Road Asset Management Enhancement Project
Author / Organization World Bank
Subject & Discipline Social Inclusion,Public Administration - Social Risk Management,Sub-National Government,Energy Networks and Storage,Public Administration - Transportation,Rural and Inter-Urban Roads
Categories Economics & Development
Publication Year 2026
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-183643
Original Source Link Visit Source Page on documents.worldbank.org »