Kosovo - Water Security and Canal Protection Project
Overview & Synopsis
Ratings of the Kosovo Water Security and Canal Protection Project for Kosovo were as follows: outcome was moderately satisfactory; Bank performance was satisfactory; monitoring and evaluation quality was substantial. Lessons and recommendations were: adopt longer term engagement models, such as multi phase programmatic approaches, to sequence rehabilitation of critical conveyance systems and underpin risk based asset management, strengthened operation and maintenance capacity, integrated flood resilience, and procurement and design practices that include unit rates for multiple bypassing methods to enable efficient work without disrupting service; strengthen resilience and rapid response capacity by designing redundancy with additional storage and alternative reserve sources for Central Kosovo, institutionalizing and regularly updating emergency protocols and coordinated response plans, and embedding rapid response features, including a Contingent Emergency Response Component (CERC), while establishing an effective asset risk management system; ensure comprehensive planning and secure stakeholder commitment during preparation by addressing budget realism, implementation timelines, and firm commitments for operation and maintenance financing, with proactive risk identification and mitigation to prevent later cancellation of critical elements; reinforce coordination mechanisms and invest in institutional capacity by training teams in technologies such as Supervisory Control and Data Acquisition (SCADA), maintaining strong environmental and social compliance, and re activating and empowering high level coordination bodies such as the Inter Ministerial Water Council (IMWC) to reduce fragmentation and sustain integrated water resources management; apply robust contractor selection with clear contractual provisions, continuous performance monitoring, timely supervision, and readiness to take corrective actions, including termination when necessary, to accelerate implementation; and maintain strong stakeholder engagement through regular consultations and transparent communication, effective grievance mechanisms, and adaptations to community needs, such as safe, controlled access to water collection points, to build trust and manage social risks effectively.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Kosovo - Water Security and Canal Protection Project |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | FY17 - Sanitation,FY17 - Public Administration - Water, Sanitation and Waste Management,FY17 - Water Supply |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-190353 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |