Turkiye - Emergency Firm Support Project
Overview & Synopsis
Ratings of the Emergency Firm Support Project for Türkiye were as follows: outcome was satisfactory; Bank performance was satisfactory; monitoring and evaluation quality was high. Targeted design is effective for identifying beneficiaries, but eligibility requirements must be calibrated to firms’ capacity to comply during crises; simplifying rigid criteria such as fixed sales decline thresholds can materially improve access for underserved segments in emergency contexts. Early institutionalization of environmental and social management systems, upfront capacity building, and practical, hands-on support are crucial for timely implementation; streamlining due diligence and updating project manuals and risk tools, including adaptations after disasters, enables rapid yet responsible financing without weakening safeguards. Implementing a wholesale, two-tier structure through participating financial intermediaries benefits from a structured training and support program: front-load capacity building with joint workshops, standardized due diligence templates, and targeted coaching; sustain recurring support through pipeline clinics and case-based portfolio reviews; transition from prior review to post review as capacity strengthens; adopt risk-based, streamlined documentation for SMEs; diversify and sequence intermediaries to expand origination capacity; and invest early in the apex institution’s oversight functions to accelerate conversion from allocations to signed sub-loans. A dual-channel design balances speed and reach; retail/direct lending through a large public bank enables rapid deployment, stronger fiduciary control, and consistent targeting of underserved SMEs, while wholesale on-lending via an apex institution expands geographic and institutional reach but requires readiness and simplified procedures; a blended approach, sequencing retail first and wholesale once eligibility, verification, and environmental and social steps are pre-agreed and capacity support is in place, is recommended. Disbursements may follow an S-curve rather than a linear path due to the time needed for capacity building, system upgrades, and the inherently longer cycle of on-lent operations; performance assessment should reflect this pattern. A well-structured results framework with clear, measurable indicators and systematic reporting is essential not only for tracking progress, but also for enabling timely, data-driven adjustments to eligibility and implementation; collecting comparable beneficiary characteristics by firm size, age, and region strengthens targeting and accountability.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Turkiye - Emergency Firm Support Project |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | FY17 - Banking Institutions |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-190426 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |