๐Ÿ“–
Bhutan - Dorjilung Hydroelectric Power Project
World Bank

Bhutan - Dorjilung Hydroelectric Power Project

Author / Organization:
Economics & Development Published 2025 Verification Pending

Overview & Synopsis

Dorjilung Hydroelectric Power Project for Bhutan has the development objective to increase hydropower capacity through private investments. The project comprises Component A - Preparatory Works, which includes Sub-components for preparatory works and Community and Local Development (CLD) tailored investments. The preparatory works Sub-component covers construction and strengthening of about twenty kilometers of access roads and bridges, establishment of site offices and on-site housing, development of construction power infrastructure, and early diversion works such as two diversion tunnels to enable concrete dam construction and adits to accelerate main works mobilization. The CLD Sub-component supports Mongar and Lhuentse districts through skilling and tailored training, enterprise development support, and finance for nano and micro enterprises without using financial intermediaries, along with community-prioritized last-mile infrastructure to improve local amenities and services, including actions that promote womenโ€™s labor-force participation. Component B - Dam, Powerhouse, and Electromechanical Works includes Sub-components for construction of main hydraulic structures and for the power generation facility. The construction of main hydraulic structures Sub-component covers civil and hydromechanical works for a roller-compacted concrete dam of approximately one hundred thirty-nine point five meters height and two hundred forty-one meters crest length, a single headrace tunnel of about fifteen kilometers, an underground powerhouse complex, and installation of hydromechanical equipment, with dam safety planning and geohazard-informed design integrated throughout. The power generation facility Sub-component provides electrical and electromechanical works, including design, supply, and installation of six Francis turbine-generating units of one hundred eighty-seven point five megawatt each, underground switchyard equipment, centralized control systems, and auxiliary electrical and mechanical systems to deliver climate-resilient, peaking run-of-river generation for domestic supply in winter and exports under long-term power purchase agreements.

Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Bhutan - Dorjilung Hydroelectric Power Project
Author / Organization World Bank
Subject & Discipline Public Administration - Energy,Energy Generation - Hydro,Energy Networks and Storage,Other - Energy and Mineral Resources
Categories Economics & Development
Publication Year 2025
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-191065
Original Source Link Visit Source Page on documents.worldbank.org »