πŸ“–
Sint Maarten - Airport Terminal Reconstruction Project
World Bank

Sint Maarten - Airport Terminal Reconstruction Project

Author / Organization:
Economics & Development Published 2025 Verification Pending

Overview & Synopsis

Ratings of the Sint Maarten Airport Terminal Reconstruction Project for Sint Maarten were as follows: outcome was highly satisfactory, Bank performance was highly satisfactory, M&E quality was substantial. The lessons highlight the value of the World Bank’s convening power and blended finance in aligning public, private, and multilateral partners to overcome funding gaps, manage risks, and prioritize climate resilience and operational continuity. Using rated criteria for complex civil works proved superior to lowest-cost selection in a live, brownfield environment, enabling the choice of qualified contractors and reducing disputes, and is recommended for similar projects. Comprehensive disaster preparedness for small island developing states should be holistic, encompassing institutional resilience through strong corporate governance and continuous capacity building; financial resilience through business continuity planning, diversified and current insurance, contingency liquidity facilities to preserve operations and jobs during shocks, sound financial management, revenue diversification, and prearranged disaster reserve mechanisms; physical resilience through materials and systems suited to high-humidity, high-wind conditions; and operational resilience through regular vulnerability audits, integrated risk assessments, and clear emergency management programs with mutual aid arrangements. Additional recommendations include immediate post-disaster attention to moisture control to prevent mold, establishing strong implementation capacity with experienced leadership and dedicated teams, addressing skilled labor shortages via flexible immigration policies and support for international workers in remote island contexts, and prioritizing design quality with independent third-party constructability reviews. Where feasible, design, supervising engineer services, and construction should be managed within a single operation to minimize interface risks; schedules must remain adaptable; stakeholder engagement should be robust; waste management should be carefully planned and monitored; and adherence to international environmental and social safeguards must be maintained. Temporary passenger processing facilities should be used whenever possible to reduce operational complexity during reconstruction. Embracing Build Back Better principles can transform recovery by delivering enhanced physical resilience (up to Category 5 hurricane readiness), environmental sustainability, improved customer experience, and long-term capacity for growth and jobs, creating regional benchmarks and turning disaster into an opportunity for sustainable development.

Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Sint Maarten - Airport Terminal Reconstruction Project
Author / Organization World Bank
Subject & Discipline FY17 - Aviation,FY17 - Public Administration - Transportation
Categories Economics & Development
Publication Year 2025
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-192010
Original Source Link Visit Source Page on documents.worldbank.org »