Burundi, Rwanda, Tanzania - AFR RI-Regional Rusumo Falls Hydroelectric Project - Implementation Completion and Results Report
Overview & Synopsis
Ratings of the AFR RI-Regional Rusumo Falls Hydroelectric Project for Burundi, Rwanda, and Tanzania were as follows: outcome was moderately satisfactory; Bank performance was satisfactory; M&E quality was substantial. Lessons and recommendations are as follows. The civil and electromechanical contract packaging was appropriate, but a remeasurable unit-rate structure for the civil works likely facilitated a high volume of claims; the Ownerโs Engineer should be strongly resourced and equipped with detailed analytical capacity to manage and defend against claims and price adjustments. Subsequent World Bank procurement reforms, including mandatory Rated Criteria and formal procedures for addressing abnormally low bids, should be rigorously applied in future operations to ensure value for money and mitigate risks associated with very low bid prices. An Independent Panel of Experts (IPOE) with global hydropower expertise is critical and should be engaged early and retained through initial years of operation; its advice on design risks, turbine cooling systems, and floating vegetation management proved essential, and future projects should provide clear pathways to ensure timely uptake of IPOE recommendations. Where civil and electromechanical contracts are co-dependent, involving selected contractors immediately after award to finalize the implementation schedule and interface plan can improve coordination, while recognizing the risk of reopening assumptions; careful early analysis with the Owner to define the optimal implementation approach is necessary, especially for sites with complex cross-border logistics. For small works under resettlement and livelihood programs, early and continuous support to local authorities and contractors is needed to strengthen capacity, reinforce environmental and social requirements, and establish robust working methods and supervision. Environment, social, health, and safety risk management must be enhanced by strengthening provisions in Standard Procurement Documents, clarifying remedies, requiring method statements aligned with contractual obligations, and increasing monitoring and oversight commensurate with high-risk civil works.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Burundi, Rwanda, Tanzania - AFR RI-Regional Rusumo Falls Hydroelectric Project - Implementation Completion and Results Report |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | FY17 - Renewable Energy Hydro,FY17 - Social Protection |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-195496 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |