Pakistan - Khyber Pakhtunkhwa Integrated Tourism Development Project : Physical and Cultural Resource Management Plan for the Installation of Showcases at Mardan Museum
Overview & Synopsis
The development objective of Khyber Pakhtunkhwa Integrated Tourism Development Project for Pakistan is to strengthen institutional capacity, increase private sector participation, and improve destination infrastructure in support of the tourism ecosystem in Khyber Pakhtunkhwa. Some of the negative impacts include: Incompatible layout plans, engineering designs and improper repair methods of the sub-project structures can undermine the ambience of the sub-project; Accidental damages may occur during the implementation of the sub-project; Waste including municipal waste and upgradation and installation waste such as concrete and spoil waste from excavation, e-waste from electoral works and waste from paint and wooden works may be generated; the movement of vehicles during material transportation storage of materials, site clearance and use of generators may cause a minor decline in air quality and generate noise; Potential risks such as electrical faults, overheating, and short-circuiting have been considered; Dismantling of old Showcases and moving and transferring of artifacts; OHS risks include injuries from lifting heavy display cases, glass panel breakage causing cuts, and hand pinching during installation; Vulnerable groups, including minorities and people with disabilities, may be excluded from stakeholder consultations and feedback opportunities; Creating an unsafe environment for women and vulnerable individuals; Vibration, accidental contact, or improper handling during installation and upgrades may harm artifacts; Toxic materials (lead, cadmium) can pollute soil/water if dumped; and Lithium Battery Risks. Some of the mitigation measures include: To ensure all technical work, including the solar system, generator, and other electrical upgrades, is executed effectively and safely, the involvement of qualified technical experts must be integrated at the design level; Ensure the provision of relevant signs for the protection of PCRs where required; Training of the workforce in the storage and handling of materials and wastes; Upgradation and installation materials will be stored away from the main campus and will be properly covered; the solar panels will be installed on the rooftop of the Town Hall building; All reusable materials will be stored and utilized within DoAM, while disposal materials will be auctioned as per GoKP standards; Provide fire prevention & fighting equipment; Map and engage stakeholders, including vulnerable groups; Engage trained personnel; Contractor must use the manufacturer's take-back program or a KP-EPA-approved recycler; and Store batteries in fireproof containers, away from heat.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Pakistan - Khyber Pakhtunkhwa Integrated Tourism Development Project : Physical and Cultural Resource Management Plan for the Installation of Showcases at Mardan Museum |
|---|---|
| Author / Organization | Borrowing Agency |
| Subject & Discipline | FY17 - Public Administration - Industry, Trade and Services,FY17 - Tourism |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-198535 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |