Türkiye - Istanbul North Rail Crossing Project : Environmental and Social Impact Assessment
Overview & Synopsis
The development objective of the İstanbul North Rail Crossing Project is to strengthen Türkiye’s role as a regional logistics hub by investing in strategic railway infrastructure along the Trans-Caspian Middle Corridor. Some of the negative impacts include: Lack of E&S Management System; Failure to coordinate environmental and social mitigation measures; Lack of continuous environmental and social monitoring may lead to unidentified non-compliance; Risks to human safety, infrastructure, and the environment from earthquakes or earthquake-induced events, including building collapse, landslides, soil liquefaction, and disruption of services, potentially affecting workers, communities, and ecosystems; Pollution of surface water due to sediment runoff, concrete washout, spills, or wastewater discharge; Interference with groundwater flows due to tunneling, deep excavation, or dewatering activities; contamination risk from fuel, wastewater, and construction chemicals; Pollution of soil and water bodies due to improper discharge of domestic and process wastewater; Emission of dust; During construction and operation phases, greenhouse gas (GHG) emissions will occur mainly from diesel-powered machinery, transportation vehicles, energy consumption, and material production; Threat to species; Insufficient wildlife connectivity / lack of fauna crossings; and Trend and population decrease of threatened species. Some of the mitigation measures include: Development and implementation of C-ESMP with all sub-management plans; Implement the monitoring plan; All engineering structure and superstructures (fill, cut) in the project closure will be designed and constructed taking into account the earthquake resistant design parameters and criteria; Reestablish the natural watercourse by removing the downstream cofferdam first, followed by the upstream one, ensuring uninterrupted flow; Conduct hydrogeological surveys prior to deep excavation or tunneling activities; Install mobile or modular treatment units or holding tanks at worker camps and regularly dispose of domestic wastewater through licensed service providers; Apply frequent water spraying on unpaved roads, stockpiles, and active work zones, especially during dry and windy conditions; Optimize rail alignment to minimize land take and forest clearance; Since the field surveys along the project corridor were conducted in June, some early spring geophyte species could not be detected; Passages to be installed at every 1 km along rail sections elevated above ground longer than 1 km; and Cirsium polycephalum seed re-location in October-November.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Türkiye - Istanbul North Rail Crossing Project : Environmental and Social Impact Assessment |
|---|---|
| Author / Organization | Borrowing Agency |
| Subject & Discipline | Energy Networks and Storage,Social Inclusion,Urban Transport,Public Administration - Transportation,Railways |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-206193 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |