Vanuatu - Climate Resilient Transport Project : Addendum to the Abbreviated Resettlement Plan for Package 2 (Road Widening Wairua Road to Pelmol (Km 17+800 to 61+800 )
Overview & Synopsis
This Addendum will cover the involuntary resettlement impacts from the road widening. All other agreed requirements set out in the approved Package 2 ARAP including policy, grievance redress mechanism, entitlements and monitoring mechanisms will apply to this addendum. The purpose of the road widening is to improve public safety by preventing accidents in tight corners as per recommendation of the Road Safety Audit. Also, the drainage construction is to prevent flooding along P2 particularly along residential areas.
Indexed from repository: World Bank Documents & Reports
(
documents.worldbank.org)
Keyboard Shortcuts:
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Vanuatu - Climate Resilient Transport Project : Addendum to the Abbreviated Resettlement Plan for Package 2 (Road Widening Wairua Road to Pelmol (Km 17+800 to 61+800 ) |
|---|---|
| Author / Organization | Borrowing Agency |
| Subject & Discipline | FY17 - Public Administration - Transportation,FY17 - Rural and Inter-Urban Roads |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-206774 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |