Environmental and Social Impact Assessment : Addendum Report - Aphalamukh Modular Ferry Terminal Project Majuli Assam
Overview & Synopsis
The Environmental and Social Impact Assessment (ESIA) study for the proposed terminal was conducted by WAPCOS Limited in March 2022-November 2022 (Report No. IN-IWT242294-CS-QCBS, October 2023) and was disclosed in AIWTDS website. Subsequently, Cumulative Impact Assessment (CIA) study was carried out for the whole project for the ferry terminals being constructed in the river Brahmaputra as part of the Assam Inland Water Transport Project (AIWTP) by Sustainability Intelligence India LLP2 with CIA report version number is 06 dated 24th May 2024. However, due to the underestimation of quantities of boulders coupled with stability concerns related to the core-filled approach ramp of the proposed terminal, has necessitated a review of the existing design. To address these issues, the AIWTD Society has engaged the Indian Institute of Technology (IIT) Guwahati to undertake a design modification study aimed at identifying appropriate and sustainable engineering alternatives. Accordingly, design modification of the ferry terminal has been carried out that include hybrid approach ramp, retaining wall, winch system and erosion mitigation. Based on the design modification of the terminal, the World Bank advised the preparation of an Addendum to the ESIA report. This Addendum ESIA report assesses the potential environmental and social impacts arising from the revised design. It includes a detailed evaluation of the impacts on the project site and its surrounding areas, along with recommended mitigation measures to avoid, minimize, or offset adverse effects.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Environmental and Social Impact Assessment : Addendum Report - Aphalamukh Modular Ferry Terminal Project Majuli Assam |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | FY17 - Ports/Waterways,FY17 - Public Administration - Transportation |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-206865 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |