The development objective of Fourth Energy Sector Project for Mongolia is to increase the capacity and reliability of the transmission grid in the project areas for renewable energy integration. This project has two components. The first component, Transmission Line Construction and Associated Substations Expansion, will finance: (i) construction of a 220 kV double-circuit transmission line from the existing Mandal Substation to the new Uvurkhangai Substation; (ii) construction of a new Uvurkhangai substation; (iii) construction of a 110kV transmission line to connect the new Uvurkhangai substation and the existing infrastructure; (iv) expansion of the existing Mandal substation to connect the new 220kV transmission line; and (v) expansion of the existing Arvaikheer and Bayankhongor Substations. The second component, Implementation Support, will provide technical and operational assistance to strengthen the institutional and technical capacity of relevant agencies, including Ministry of Energy (MOE) and other entities affiliated with MOE.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Mongolia - Fourth Energy Sector Project |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | Project Appraisal Document |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-223676 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |