Overview & Synopsis

The development objective of the Transforming Power Transmission System Project as Phase 7 of Multiphase Programmatic Approach (MPA) of the Europe and Central Asia Renewable Energy Scale-up (ECARES) is to enable the integration of increased renewable energy capacity into the power transmission grid in Türkiye. The project has three components, the first of which is strengthening the transmission network to facilitate VRE scale-up and improve its reliability and resilience. This component will address immediate and localized grid constraints that could delay the deployment of VRE projects or lead to a high-level of curtailment and should directly contribute to unlocking 1.7 GW of RE, by reinforcing and modernizing TEİAŞ’s 400 kV and 154 kV transmission network through constructing new substations, modernizing and upgrading existing substations, and laying new transmission lines. The second component is the digitalization to strengthen grid operation and management, and support VRE integration. This component aims at digitalizing the grid and at supporting TEİAS with the adoption of new digital tools to facilitate grid management and operations in a context of large VRE penetration. Finally, the third component is the technical assistance for TEİAS to explore innovative technologies and solutions to accelerate renewable energy integration in the grid. This component will cover, but is not limited to, introducing HVDC technologies to accelerate renewable energy integration in the grid. HVDC technology offers a cost-effective solution for transmitting bulk electricity over long distances, and with Turkiye's expanding power system and high VRE potential in remote regions, this technology is highly relevant.

Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Turkiye - Transforming Power Transmission System Project as Phase 7 of Multiphase Programmatic Approach (MPA) of the Europe and Central Asia Renewable Energy Scale-up (ECARES)
Author / Organization World Bank
Subject & Discipline Public Administration - Water, Sanitation, and Solid Waste Management ,Other - Agriculture, Fishing, and Forestry ,Agricultural Extension, Research, and Other Support Activities ,Public Administration - Agriculture, Fishing, and Forestry ,Water Resources,Irrigation and Drainage
Categories Economics & Development
Publication Year 2025
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-239350
Original Source Link Visit Source Page on documents.worldbank.org »