Bolivia - Santa Cruz Road Corridor Connector Project : First Progress Report on the implementation of the Management Action Plan in response to the Inspection Panel Investigation
Overview & Synopsis
This is the first Progress Report to the Board of Executive Directors (the “Board”) on the implementation of the Management Action Plan (MAP) in response to the Inspection Panel Investigation Report No. 187506-BO, dated February 12, 2024, on the Plurinational State of Bolivia: Santa Cruz Road Corridor Connector Project (P152281, the “Project”). The Project Development Objective (PDO) is “to improve transport accessibility along the road corridor between San Ignacio de Velasco and San José de Chiquitos” by upgrading the 208-kilometer road connecting these two municipal capitals in the department of Santa Cruz from gravel to asphalt concrete. This includes the construction of bypasses in populated areas, three small bridges, and approximately 300 culverts. The implementation agency is the Administradora Boliviana de Carreteras (ABC).
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Bolivia - Santa Cruz Road Corridor Connector Project : First Progress Report on the implementation of the Management Action Plan in response to the Inspection Panel Investigation |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | FY17 - Rural and Inter-Urban Roads,FY17 - Public Administration - Transportation |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-254276 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |