Lao Peoples Democratic Republic - Pollution and Waste Management Project
Overview & Synopsis
Lao PDR Pollution and Waste Management Project for Lao People’s Democratic Republic has the development objectives to strengthen monitoring and enforcement of pollution management, improve municipal solid waste management in targeted areas in Vientiane Capital, and provide immediate and effective response in case of an eligible crisis or emergency. Component 1: Advancing Systems for Waste and Pollution Management strengthens national capacity for waste, plastics, and pollution control. Sub-components 1.1: Upgrading Pollution Monitoring and Enforcement develops and deploys a compliance monitoring system for air and water pollution control in key sectors, upgrades air quality and water quality stations, and builds institutional procedures and skills for data management and enforcement; Sub-components 1.2: Strengthen Waste and Plastic Management System supports a national waste management decree, establishes an inter-ministerial Waste Management Committee, creates a basic waste and plastics information database, scales up community-based plastic initiatives and recycling banks, and supports implementation of the National Plastics Action Plan including measures such as extended producer responsibility and single-use plastics reduction; Sub-components 1.3: Component 1 Coordination and Reporting provides technical and operational assistance for fiduciary management, environmental and social risk management, monitoring and evaluation, and auditing. Component 2: Improving Municipal Solid Waste Services in Vientiane Capital strengthens planning, operations, cost recovery, and infrastructure for integrated solid waste management. Sub-components 2.1: Municipal Solid Waste Service Planning, Operation, Monitoring, and Cost Recovery in Vientiane Capital develops local regulations, prepares a municipal solid waste management plan with zones, schedules, recycling and fee structures, establishes operational manuals for equipment, transfer stations, composting and sanitary landfill operations, introduces a fee model and contract performance indicators, and enhances livelihoods and occupational health and safety for informal waste workers including measures to prevent hazardous child labor; Sub-components 2.2: Municipal Solid Waste Service Infrastructure Investments in Vientiane Capital prepares feasibility and design studies and environmental and social instruments, rehabilitates the KM32 landfill with sanitary cells, leachate collection and treatment, methane gas capture, waste reception and worker facilities, upgrades the KM16 transfer station with sorting, compacting and composting, establishes a new transfer station in Naxaythong with similar facilities, and expands low-emission collection vehicles to increase service coverage; Sub-components 2.3: Project Coordination and Reporting funds project management, monitoring, learning, communication, gender and citizen engagement, and audit. Component 3: Contingent Emergency Response Component enables rapid reallocation of project resources to support emergency response and recovery under a dedicated manual and emergency action plan aligned with climate adaptation and mitigation considerations.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Lao Peoples Democratic Republic - Pollution and Waste Management Project |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | Public Administration - Water, Sanitation, and Solid Waste Management ,Solid Waste Management |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-262764 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |