Georgia - Transmission Grid Strengthening Project : Strategic Environmental and Social Assessment
Overview & Synopsis
The development objective of the Transmission Grid Strengthening Project for Georgia is to increase export of electricity from the newly constructed hydropower generation stations in the Ajara region and to improve electricity supply to the city of Batumi by strengthening the south-western transmission grid. Some of the negative impacts include: loss or damage to resource due to construction; impact on noise; impact on light; impact on biodiversity; damage to UNESCO cultural heritage; damage to birds and species; damage to ecosystem; permanent loss of forestland at arrays, roads, transmission corridors; and impact on housing and livelihood. Some of the mitigation measures include: No projects inside national parks or other legally protected areas; no project near bird areas; no project near surface water; no project near ecosystems; and avoid placing turbines in forest areas where possible.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Georgia - Transmission Grid Strengthening Project : Strategic Environmental and Social Assessment |
|---|---|
| Author / Organization | Borrowing Agency |
| Subject & Discipline | FY17 - Energy Transmission and Distribution,FY17 - Public Administration - Energy and Extractives |
| Categories | Economics & Development |
| Publication Year | 2025 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-297714 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |