📖
Georgia - Secondary Road Asset Management Project
World Bank

Georgia - Secondary Road Asset Management Project

Author / Organization:
Economics & Development Published 2024 Verification Pending

Overview & Synopsis

Ratings for the Secondary Road Asset Management Project for Georgia were as follows: outcomes were moderately satisfactory, bank performance was moderately satisfactory, and monitoring and evaluation quality was substantial. Some lessons learned included the following: with more frequent extreme weather events causing disruptions in the road network, especially in mountainous terrains as in the case of Georgia, collecting data systematically and being able to assess the exposure, vulnerability, and criticality of infrastructure can help to better estimate investment needs and prioritize interventions. When assessing the capacity and readiness of the construction industry, accounting for contextual developments in neighboring countries is essential, especially for small geographies. SRAMP builds on the achievements of previous WB-funded projects aiming at improving, increasingly, not only the physical quality of the secondary road network but also the institutional capacity to manage their road assets and sustain the progress in time through enhanced planning systems. Building such capacity requires time and a series of sequential steps that can be better achieved and sustained through continued engagement and commitment. Several modifications were done on the procurement side throughout the SRAMP implementation to help RD respond to challenges to tender some civil works based on market conditions. For instance, the WB issued no objection to RD splitting specific DB packages into multiple lots and reducing the qualification requirements to increase competition in both DB contracts and the climate resilience works in the Racha region. Some of these changes were possible to implement thanks to the parallel financing from the Borrower (the project was designed to draw counterpart finance later in the implementation, as opposed to co-financing a share at the level of each invoice). Similarly, the parallel financing allowed RD to engage a local contractor, with whom RD holds an ongoing framework contract for road maintenance in the Guria region, to take over rehabilitation work quickly from a contractor after contract termination due to non-performance and limit further delays.

Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Georgia - Secondary Road Asset Management Project
Author / Organization World Bank
Subject & Discipline FY17 - Rural and Inter-Urban Roads,FY17 - Public Administration - Transportation
Categories Economics & Development
Publication Year 2024
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-307680
Original Source Link Visit Source Page on documents.worldbank.org »