Bangladesh - Municipal Water Supply and Sanitation Project
Overview & Synopsis
Ratings of the Bangladesh Municipal Water Supply and Sanitation Project for Bangladesh were as follows: outcome was moderately satisfactory; Bank performance was satisfactory; M&E quality was substantial. Operational subsidies and institutional readiness must be sequenced with system maturity, not project timelines; future programs should link operations and maintenance (O&M) subsidies to progressive commissioning milestones, embed operational financing within public finance frameworks tied to performance benchmarks, make verified institutional readiness a precondition for commissioning, and stress-test financial models for utility price volatility. Performance-based incentive design must evolve with institutional maturity, with sector oversight developed alongside; tiered incentive structures should be linked to service delivery outcomes, sector oversight should be treated as a distinct objective with dedicated resources, indicators, and implementation support, and third-party approvals such as tariff bye-law endorsement should be treated as critical path milestones from the outset. Womenโs economic participation in water and sanitation service delivery can be successfully integrated into municipal service models and should be scaled deliberately; site selection should be driven by viability, revenue models should be strengthened, and economic participation outcomes should be systematically tracked. Private contractor market depth must be assessed and developed alongside infrastructure design in small municipalities; upfront market assessments should be conducted, contracts should be bundled across municipalities to attract larger firms, and municipal contract management capacity should be established as a readiness condition. Fecal sludge management (FSM) service delivery requires an explicit operational model, viable revenue streams, and sustained demand before facilities are commissioned; operational and business arrangements should be defined prior to commissioning, technical support should be provided during the early operating period, regulatory compliance and demand creation should be strengthened, and successful FSM models should be replicated through structured learning and knowledge sharing.
documents.worldbank.org)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Bangladesh - Municipal Water Supply and Sanitation Project |
|---|---|
| Author / Organization | World Bank |
| Subject & Discipline | FY17 - Water Supply,FY17 - Public Administration - Water, Sanitation and Waste Management,FY17 - Sanitation |
| Categories | Economics & Development |
| Publication Year | 2026 |
| License / Rights | Creative Commons Attribution 4.0 (CC BY 4.0) |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
World Bank Documents & Reports
(documents.worldbank.org)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-73583 |
| Original Source Link | Visit Source Page on documents.worldbank.org » |